Energy · Halcyon Energy

Taking field engineers off paper, permanently

A utility replaced clipboard inspections with an offline-first mobile platform used at 900 sites.

Sites live
900+
Field adoption
94%
Compliance reporting
2 wks → 1 day

The challenge

Field inspections were recorded on paper and re-keyed days later. Half the sites had no reliable signal, which had killed two previous digital attempts.

What we did

  1. 01Designed offline-first from the start, with conflict resolution built into the sync layer
  2. 02Ran design sessions on site, in the weather, with the engineers using it
  3. 03Shipped to one region as a genuine pilot, with a real option to stop
  4. 04Integrated with the existing asset management system rather than replacing it
  5. 05Built the compliance report generator the regulator actually asks for

The outcome

Inspection data now lands the same day, report preparation dropped from two weeks to a morning, and adoption hit 94% within a quarter.